Thirteen classrooms as well as a custodian lounge, storage room, and change rooms were completely renovated. A barrier free ramp and two elevators were also installed. Included in the renovated classrooms were specialty areas such as a science lab, art and drama areas, a dance studio, and an instrumental music room. The scope of work for this project was extensive and included interior excavation and demolition, footings, poured walls, grouting and parging, masonry, steel framing, rough & finish carpentry, millwork, waterproofing, sound insulation, roofing, fireproofing, door & mirror installation, drywall, flooring and painting, interior and exterior signage, and landscaping. The approximate square footage was 40,000 square feet. This project was completed within a 5 month construction schedule.
Client: Kawartha Pine Ridge District School Board
Completion Date: December 2012
Project Delivery Method: Design-Bid-Build
Project Name: Thomas A Stewart Secondary School Renovations
Project Location: Peterborough, Ontario